Withdrawn queue requests in South Dakota (2019 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown7679 MW
Active in queue300 MW2 requests
Agreement signed50.0 MW1 requests
Withdrawn7679 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

7 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Onshore wind project GEN-2019-060, Day County
Onshore wind
150 MWWithdrawn / abandoned Day, SDSPP May 20192025
Onshore wind project GEN-2019-017, Butte County
Onshore wind
143 MWWithdrawn / abandoned Butte, SDSPP Apr 20192025
Solar project GEN-2019-006, Spink County
Solar
100 MWWithdrawn / abandoned Spink, SDSPP Apr 2019target 2022
Solar project J1328, Grant County
Solar
100 MWWithdrawn / abandoned Grant, SDMISO Apr 2019target 2022
Battery storage project GEN-2019-032, Day County
Battery storage
63.1 MWWithdrawn / abandoned Day, SDSPP Apr 2019target 2020
Solar project GEN-2019-057, Day County
Solar
63.1 MWWithdrawn / abandoned Day, SDSPP Apr 2019target 2020
Battery storage project GEN-2019-040, Yankton County
Battery storage
60.0 MWWithdrawn / abandoned Yankton, SDSPP May 2019target 2021

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)