United States βΊ Grid βΊ Interconnection queues βΊ South Dakota
BATTERY STORAGE Β· SPPBattery storage project GEN-2019-040, Yankton County
Battery storage project GEN-2019-040, Yankton County is a 60.0 MW battery storage request withdrawn in the SPP interconnection queue, in Yankton County, South Dakota.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2019 (completed)
- Withdrawn / abandonedAug 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2019-040
- Grid region
- SPP (Southwest Power Pool)
- Location
- Yankton County, South Dakota
- Technology
- Battery: 60.0 MW
- Total requested
- 60.0 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 21 May 2019
- Proposed online date
- June 2021
- Withdrawn
- August 2019
Location
Marker shows the centre of Yankton County; the queue data does not give exact sites.
Power plants in South Dakota Β· Transmission lines in South Dakota
Other requests in Yankton County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem