Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown112,285 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn112,285 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

11 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Offshore Wind
Offshore wind
1,200 MWWithdrawn / abandoned RIISO-NE Apr 2024target 2031
Battery Storage
Battery storage
415 MWWithdrawn / abandoned Providence, RIISO-NE Jun 2024target 2027
Battery Storage
Battery storage
313 MWWithdrawn / abandoned Washington, RIISO-NE Jun 2024target 2027
Battery Storage
Battery storage
166 MWWithdrawn / abandoned Providence, RIISO-NE May 2024target 2028
Battery Storage
Battery storage
108 MWWithdrawn / abandoned Providence, RIISO-NE Jun 2024target 2027
Wood River Substation - Western RI DER Study #3
Solar
49.0 MWWithdrawn / abandoned Washington, RIISO-NE Aug 2024target 2026
Kent County Substation - Western RI DER Study #3
Solar
21.7 MWWithdrawn / abandoned Kent, RIISO-NE Aug 2024target 2026
Woonsocket Substation β€šΓ„Γ¬ Tifft ST BESS
Battery storage
4.5 MWWithdrawn / abandoned Providence, RIISO-NE Nov 2024target 2026
Tower Hill Substation - Western RI DER Study #3
Solar
3.1 MWWithdrawn / abandoned Washington, RIISO-NE Aug 2024target 2026
Point St Substation β€šΓ„Γ¬ Aldrich St BESS
Battery storage
3.0 MWWithdrawn / abandoned Providence, RIISO-NE Nov 2024target 2026
Chase Hill Substation - Western RI DER Study #3
Solar
2.4 MWWithdrawn / abandoned Washington, RIISO-NE Aug 2024target 2026

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)