United States βΊ Grid βΊ Interconnection queues βΊ Rhode Island
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in Rhode Island (2024 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Offshore Wind Offshore wind |
1,200 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
415 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
313 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
166 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
108 MW | Withdrawn / abandoned |
| Wood River Substation - Western RI DER Study #3 Solar |
49.0 MW | Withdrawn / abandoned |
| Kent County Substation - Western RI DER Study #3 Solar |
21.7 MW | Withdrawn / abandoned |
| Woonsocket Substation βΓΓ¬ Tifft ST BESS Battery storage |
4.5 MW | Withdrawn / abandoned |
| Tower Hill Substation - Western RI DER Study #3 Solar |
3.1 MW | Withdrawn / abandoned |
| Point St Substation βΓΓ¬ Aldrich St BESS Battery storage |
3.0 MW | Withdrawn / abandoned |
| Chase Hill Substation - Western RI DER Study #3 Solar |
2.4 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)