United States βΊ Grid βΊ Interconnection queues βΊ Ohio
OCTARY USA Β· INTERCONNECTION QUEUESGas interconnection queue in Ohio
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Gas project AH1-680, Carroll County Gas Β· Chestnut Run Energy LLC |
1,300 MW | In study |
| Trumbull Energy Center Gas |
940 MW | Agreement signed |
| Gas project AH1-711, Wood County Gas Β· Troy Energy, LLC |
408 MW | In study |
| West Lorain Power Plant 345 kV Gas |
406 MW | Agreement signed |
| Gas project H037, Lucas County Gas |
135 MW | Agreement signed |
| Gas project AJ1-023, Trumbull County Gas |
70.0 MW | In study |
| Gas project AH1-699, Columbiana County Gas Β· South Field Energy LLC |
69.0 MW | In study |
| Gas project AH2-106, Columbiana County Gas |
69.0 MW | In study |
| West Lorain Power Plant 345 kV Gas |
33.0 MW | Agreement signed |
| Gas project AH1-706, Trumbull County Gas Β· Clean Energy Future - Lordstown, LLC |
30.5 MW | In study |
| Gas project AH1-719, Washington County Gas Β· Washington Power Generation LLC |
24.0 MW | In study |
| Gas project AH1-686, Lawrence County Gas Β· Hanging Rock Power Company LLC |
24.0 MW | In study |
| Gas project AH1-704, Monroe County Gas Β· Long Ridge Energy Generation LLC |
24.0 MW | In study |
| Gas project AH2-111, Monroe County Gas |
20.0 MW | In study |
| West Lorain 138 kV Power Plant Gas |
11.3 MW | Agreement signed |
| West Lorain 138 kV Power Plant Gas |
8.0 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)