πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Ohio

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Ohio (2019 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown141,537 MW
Active in queue3,339 MW34 requests
Agreement signed2,742 MW26 requests
Withdrawn404,295 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

14 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Fox Squirrel Solar
Solar
577 MWOperating Madison, OHPJM Feb 20192024
Union Solar
Solar
325 MWOperating Union, OHPJM Sep 20192024
Powell Creek Solar
Solar
150 MWOperating Putnam, OHPJM Feb 20192025
Wheatsborough Solar
Solar
125 MWOperating Erie, OHPJM Mar 20192025
Clearview Solar I
Solar
99.0 MWOperating Champaign, OHPJM Mar 20192025
Arche Energy Project
Solar
67.0 MWOperating Fulton, OHPJM Mar 20192024
Montpelier Solar
Solar
49.0 MWOperating Williams, OHPJM Mar 20192025
Clearview Solar I
Solar
45.0 MWOperating Champaign, OHPJM Aug 20192025
Arche Energy Project
Solar
40.0 MWOperating Fulton, OHPJM Aug 20192024
Yankee 1-7
Gas
23.5 MWOperating Montgomery, OHPJM Mar 20192022
Nickel Solar
Solar
19.9 MWOperating Warren, OHPJM Oct 20192024
Gavin Unit No. 1
Coal
11.0 MWOperating Gallia, OHPJM Jul 20192025
Avon Lake Plant
Other
4.0 MWOperating Lorain, OHPJM Sep 20192020
Niles A CT
Other
1.5 MWOperating Trumbull, OHPJM Sep 20192020

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)