United States βΊ Grid βΊ Interconnection queues βΊ Ohio
SOLAR Β· PJMNickel Solar
Nickel Solar is a 19.9 MW solar request built and operating in the PJM interconnection queue, in Warren County, Ohio, connecting to DEOK.
Request details
- Queue ID
- AF1-249
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- DEOK
- Connection point (POI)
- Nickel 12.47 kV
- Location
- Warren County, Ohio
- Technology
- Solar: 19.9 MW
- Total requested
- 19.9 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Wholesale Market P
- Queue status
- Operational
- Entered queue
- 2 October 2019
- Proposed online date
- October 2024
- Came online
- December 2024
Location
Marker shows the centre of Warren County; the queue data does not give exact sites.
Other requests in Warren County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem