United States β€Ί Grid β€Ί Interconnection queues β€Ί Ohio

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Ohio (2013 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown8577 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn151,434 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

8 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Middletown Energy Center
Gas
513 MWOperating Butler, OHPJM Oct 20132018
Gavin Unit #2
Coal
36.0 MWOperating Gallia, OHPJM Feb 20132015
AES Tait Energy Storage
Battery storage
8.0 MWOperating Montgomery, OHPJM Apr 20132013
Willey Energy Storage Project
Battery storage
6.0 MWOperating Hamilton, OHPJM Sep 20132015
Clinton County Energy Storage Project
Battery storage
6.0 MWOperating Clinton, OHPJM Oct 20132016
Battery storage project Y3-097, Delaware County
Battery storage
4.0 MWOperating Delaware, OHPJM Apr 2013target 2015
Beckjord Battery #1
Battery storage
2.0 MWOperating Clermont, OHPJM Apr 20132015
Beckjord Battery #2
Battery storage
2.0 MWOperating Clermont, OHPJM Apr 20132015

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)