AES Tait Energy Storage

AES Tait Energy Storage is a 8.0 MW battery storage request built and operating in the PJM interconnection queue, in Montgomery County, Ohio, connecting to Dayton.

Queue statusOperating
  1. PlanningQueued Apr 2013 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingSep 2013 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
Y3-080
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
Dayton
Connection point (POI)
Tait 69kV
Location
Montgomery County, Ohio
Technology
Battery: 8.0 MW
Total requested
8.0 MW
Service type
Energy only (ERIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
19 April 2013
Proposed online date
March 2014
Came online
September 2013

Location

Marker shows the centre of Montgomery County; the queue data does not give exact sites.

Power plants in Ohio · Transmission lines in Ohio

Other requests in Montgomery County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem