GAS · PJMTait Generating Units 4-7
Tait Generating Units 4-7 is a 15.0 MW gas request built and operating in the PJM interconnection queue, in Montgomery County, Ohio, connecting to Dayton.
Request details
- Queue ID
- R14
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dayton
- Connection point (POI)
- Tait 69kV
- Location
- Montgomery County, Ohio
- Technology
- Gas: 15.0 MW
- Total requested
- 15.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
- Queue status
- Operational
- Entered queue
- 29 September 2006
- Proposed online date
- May 2007
- Came online
- May 2007
Location
Marker shows the centre of Montgomery County; the queue data does not give exact sites.
Other requests in Montgomery County
- Prairie Flyer Energy StorageBattery storage · 85.0 MW · agreement signed
- Solar project AF2-298, Montgomery CountySolar · 49.9 MW · agreement signed
- Solar + storage project AH2-242, Montgomery CountySolar + storage · 45.0 MW · in study
- Yankee 1-7Gas · 23.5 MW · built
- Tait Generating StationGas · 13.0 MW · built
- AES Tait Energy StorageBattery storage · 12.0 MW · built
- AES Tait Energy StorageBattery storage · 8.0 MW · built
- Solar project V4-073, Montgomery CountySolar · 2.5 MW · built
- Gas project AF2-012, Montgomery CountyGas · 104 MW · withdrawn
- Gas project AE2-296, Montgomery CountyGas · 104 MW · withdrawn
- Solar project AE1-030, Montgomery CountySolar · 100 MW · withdrawn
- Solar project AE1-031, Montgomery CountySolar · 100 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem