πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί North Dakota

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in North Dakota (2020 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown101,699 MW
Active in queue150 MW1 requests
Agreement signed150 MW1 requests
Withdrawn101,699 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

10 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Onshore wind project J1613, Cass County
Onshore wind
400 MWWithdrawn / abandoned Cass, NDMISO Jun 2020target 2023
Solar project GEN-2020-006, Bowman County
Solar
250 MWWithdrawn / abandoned Bowman, NDSPP Apr 2020target 2026
Onshore wind project GEN-2020-021, Sioux County
Onshore wind
235 MWWithdrawn / abandoned Sioux, NDSPP Apr 2020target 2026
Solar project J1540, Cass County
Solar
200 MWWithdrawn / abandoned Cass, NDMISO Jun 2020target 2024
Solar project J1544, Morton County
Solar
200 MWWithdrawn / abandoned Morton, NDMISO Jun 2020target 2023
Onshore wind project J1754, Mchenry County
Onshore wind
200 MWWithdrawn / abandoned Mchenry, NDMISO Jun 2020target 2023
Solar project J1622, Sheridan County
Solar
100 MWWithdrawn / abandoned Sheridan, NDMISO Jun 2020target 2024
Onshore wind project J1758, Barnes County
Onshore wind
42.0 MWWithdrawn / abandoned Barnes, NDMISO Jun 2020target 2023
Onshore wind project J1761, Barnes County
Onshore wind
39.0 MWWithdrawn / abandoned Barnes, NDMISO Jun 2020target 2023
Onshore wind project J1763, Cavalier County
Onshore wind
33.0 MWWithdrawn / abandoned Cavalier, NDMISO Jun 2020target 2023

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)