United States βΊ Grid βΊ Interconnection queues βΊ North Dakota
ONSHORE WIND Β· SPPOnshore wind project GEN-2020-021, Sioux County
Onshore wind project GEN-2020-021, Sioux County is a 235 MW onshore wind request withdrawn in the SPP interconnection queue, in Sioux County, North Dakota, connecting to BEPC.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2020 (completed)
- Withdrawn / abandonedNov 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2020-021
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- BEPC
- Connection point (POI)
- LeLand Olds-Chapelle Creek 345kV line
- Location
- Sioux County, North Dakota
- Technology
- Wind: 235 MW
- Total requested
- 235 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 24 April 2020
- Proposed online date
- December 2026
- Withdrawn
- November 2025
Location
Marker shows the centre of Sioux County; the queue data does not give exact sites.
Power plants in North Dakota Β· Transmission lines in North Dakota
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem