United States βΊ Grid βΊ Interconnection queues βΊ North Carolina
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in North Carolina (2015 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Gas project 8599, Buncombe County Gas Β· Duke Energy Progress, LLC |
470 MW | Withdrawn / abandoned |
| Gas project 8600, Buncombe County Gas Β· Duke Energy Progress, LLC |
280 MW | Withdrawn / abandoned |
| Onshore wind project AB1-077, Perquimans County Onshore wind |
150 MW | Withdrawn / abandoned |
| Little Alligator Windfarm Onshore wind |
130 MW | Withdrawn / abandoned |
| Solar project AA2-179, Washington County Solar |
80.0 MW | Withdrawn / abandoned |
| Solar project AA2-181, Northampton County Solar |
80.0 MW | Withdrawn / abandoned |
| Solar project AA2-157, Martin County Solar |
80.0 MW | Withdrawn / abandoned |
| Solar project AA2-162, Camden County Solar |
80.0 MW | Withdrawn / abandoned |
| Solar project AA2-156, Currituck County Solar |
80.0 MW | Withdrawn / abandoned |
| Solar project AA2-175, Gates County Solar |
80.0 MW | Withdrawn / abandoned |
| Solar project AA2-118, Hertford County Solar |
35.2 MW | Withdrawn / abandoned |
| Solar project AA2-056, Halifax County Solar |
20.0 MW | Withdrawn / abandoned |
| Solar project AA2-055, Halifax County Solar |
20.0 MW | Withdrawn / abandoned |
| Five Forks Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Solar project AA2-149, Northampton County Solar |
20.0 MW | Withdrawn / abandoned |
| N301 Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Solar project AA2-164, Hertford County Solar |
20.0 MW | Withdrawn / abandoned |
| Solar project AB1-156, Camden County Solar |
20.0 MW | Withdrawn / abandoned |
| Solar project AA2-105, Halifax County Solar |
20.0 MW | Withdrawn / abandoned |
| Solar project AA2-113, Halifax County Solar |
16.0 MW | Withdrawn / abandoned |
| Edenton Solar Solar |
10.0 MW | Withdrawn / abandoned |
| Solar project AB1-053, Halifax County Solar |
10.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)