SOLAR Β· PJMSolar project AA2-179, Washington County
Solar project AA2-179, Washington County is a 80.0 MW solar request withdrawn in the PJM interconnection queue, in Washington County, North Carolina, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2015 (completed)
- Withdrawn / abandonedMay 2015 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AA2-179
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Creswell-Mackeys 115kV
- Location
- Washington County, North Carolina
- Technology
- Solar: 80.0 MW
- Total requested
- 80.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 30 April 2015
- Proposed online date
- June 2015
- Withdrawn
- May 2015
Location
Marker shows the centre of Washington County; the queue data does not give exact sites.
Power plants in North Carolina Β· Transmission lines in North Carolina
Other requests in Washington County
- Macadamia SolarSolar Β· 300 MW Β· agreement signed
- Macadamia SolarSolar Β· 109 MW Β· agreement signed
- Macadamia SolarSolar Β· 75.0 MW Β· agreement signed
- Albemarle Beach SolarSolar Β· 60.0 MW Β· agreement signed
- Solar project AH1-040, Washington CountySolar Β· 150 MW Β· in study
- Ablemarle Beach SolarSolar Β· 80.0 MW Β· built
- Onshore wind project W3-053, Washington CountyOnshore wind Β· 260 MW Β· withdrawn
- Solar project AF1-073, Washington CountySolar Β· 200 MW Β· withdrawn
- Solar project AF2-047, Washington CountySolar Β· 150 MW Β· withdrawn
- Onshore wind project Y1-043, Washington CountyOnshore wind Β· 150 MW Β· withdrawn
- Solar project AB2-189, Washington CountySolar Β· 120 MW Β· withdrawn
- Solar project AD2-195, Washington CountySolar Β· 80.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem