United States βΊ Grid βΊ Interconnection queues βΊ North Carolina
SOLAR Β· PJMSolar project AF2-047, Washington County
Solar project AF2-047, Washington County is a 150 MW solar request withdrawn in the PJM interconnection queue, in Washington County, North Carolina, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2019 (completed)
- Withdrawn / abandonedJun 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AF2-047
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Developer
- Creswell HWY 64 Solar, LLC
- Connection point (POI)
- Creswell-Riders Creek 115 kV
- Location
- Washington County, North Carolina
- Technology
- Solar: 150 MW
- Total requested
- 150 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 19 December 2019
- Proposed online date
- June 2022
- Withdrawn
- June 2024
Location
Marker shows the centre of Washington County; the queue data does not give exact sites.
Power plants in North Carolina Β· Transmission lines in North Carolina
Other requests in Washington County
- Macadamia SolarSolar Β· 300 MW Β· agreement signed
- Macadamia SolarSolar Β· 109 MW Β· agreement signed
- Macadamia SolarSolar Β· 75.0 MW Β· agreement signed
- Albemarle Beach SolarSolar Β· 60.0 MW Β· agreement signed
- Solar project AH1-040, Washington CountySolar Β· 150 MW Β· in study
- Ablemarle Beach SolarSolar Β· 80.0 MW Β· built
- Onshore wind project W3-053, Washington CountyOnshore wind Β· 260 MW Β· withdrawn
- Solar project AF1-073, Washington CountySolar Β· 200 MW Β· withdrawn
- Onshore wind project Y1-043, Washington CountyOnshore wind Β· 150 MW Β· withdrawn
- Solar project AB2-189, Washington CountySolar Β· 120 MW Β· withdrawn
- Solar project AA2-179, Washington CountySolar Β· 80.0 MW Β· withdrawn
- Solar project AD2-195, Washington CountySolar Β· 80.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem