OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in Nevada (2016 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Copper Rays Solar |
722 MW | Withdrawn / abandoned |
| Solar project Company 148, Clark County Solar |
440 MW | Withdrawn / abandoned |
| Southland Solar |
380 MW | Withdrawn / abandoned |
| Copper MTN Solar 5 Solar + storage |
277 MW | Withdrawn / abandoned |
| Re Prism Solar |
209 MW | Withdrawn / abandoned |
| South Ridge Solar |
205 MW | Withdrawn / abandoned |
| Yellow Pine 1 Solar |
153 MW | Withdrawn / abandoned |
| Solar project Company 149, Clark County Solar |
126 MW | Withdrawn / abandoned |
| Solar project Company HI, Nye County Solar |
100 MW | Withdrawn / abandoned |
| Pahrump Solar Solar |
87.5 MW | Withdrawn / abandoned |
| Solar project Company HB, Pershing County Solar |
70.0 MW | Withdrawn / abandoned |
| Desert Obsidian Solar |
67.2 MW | Withdrawn / abandoned |
| Solar project Company HH, Pershing County Solar |
50.0 MW | Withdrawn / abandoned |
| Other project Company 150, Clark County Other |
43.5 MW | Withdrawn / abandoned |
| Geothermal project Company HF, Lander County Geothermal |
38.5 MW | Withdrawn / abandoned |
| Geothermal project Company HG, Pershing County Geothermal |
38.5 MW | Withdrawn / abandoned |
| Geothermal project Company HC, Mineral County Geothermal |
25.0 MW | Withdrawn / abandoned |
| Geothermal project Company HJ, Churchill County Geothermal |
20.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)