OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in Nevada (2010 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| El Dorado Valley Generation Gas |
600 MW | Withdrawn / abandoned |
| Panoche Valley Solar Farm Expansion Solar |
400 MW | Withdrawn / abandoned |
| TGP NNP Geothermal |
364 MW | Withdrawn / abandoned |
| Solar project Company 96, Clark County Solar |
350 MW | Withdrawn / abandoned |
| Nevada 300 Solar |
300 MW | Withdrawn / abandoned |
| Copper Mountain Solar III (Black Hills) Solar |
242 MW | Withdrawn / abandoned |
| Onshore wind project Company 88, Clark County Onshore wind |
200 MW | Withdrawn / abandoned |
| Solar project Company 90, Lincoln County Solar |
100 MW | Withdrawn / abandoned |
| Solar project Company 91, Clark County Solar |
55.0 MW | Withdrawn / abandoned |
| Solar project Company 98, Clark County Solar |
50.0 MW | Withdrawn / abandoned |
| Solar project Company 97, Clark County Solar |
50.0 MW | Withdrawn / abandoned |
| Solar project Company EU, Lincoln County Solar |
35.0 MW | Withdrawn / abandoned |
| Solar project Company 92, Clark County Solar |
22.0 MW | Withdrawn / abandoned |
| Solar project Company 93, Clark County Solar |
20.0 MW | Withdrawn / abandoned |
| Solar project Company 95, Clark County Solar |
20.0 MW | Withdrawn / abandoned |
| Solar project Company 99, Clark County Solar |
20.0 MW | Withdrawn / abandoned |
| Solar project Company 94, Clark County Solar |
20.0 MW | Withdrawn / abandoned |
| Solar project Company 87, Clark County Solar |
6.0 MW | Withdrawn / abandoned |
| Terra Gen Dixie Valley Expansion Geothermal |
5.6 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)