United States β€Ί Grid β€Ί Interconnection queues β€Ί Nebraska

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Nebraska (2020 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown232,991 MW
Active in queue1,833 MW8 requests
Agreement signed1,245 MW5 requests
Withdrawn232,991 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

23 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project GEN-2020-024, Sarpy County
Gas
425 MWWithdrawn / abandoned Sarpy, NESPP Apr 20202023
Gas project GEN-2020-035, Cass County
Gas
425 MWWithdrawn / abandoned Cass, NESPP Apr 20202023
Solar + storage project GEN-2020-036, Cass County
Solar + storage
303 MWWithdrawn / abandoned Cass, NESPP Apr 20202023
Gas project GEN-2020-040, Cass County
Gas
303 MWWithdrawn / abandoned Cass, NESPP Apr 20202023
Solar project GEN-2020-051, Lincoln County
Solar
250 MWWithdrawn / abandoned Lincoln, NESPP Apr 20202025
Solar project GEN-2020-004, Otoe County
Solar
250 MWWithdrawn / abandoned Otoe, NESPP Apr 2020target 2026
Onshore wind project GEN-2020-077, Thayer County
Onshore wind
151 MWWithdrawn / abandoned Thayer, NESPP Apr 20202025
Gas project GEN-2020-032, Sarpy County
Gas
56.5 MWWithdrawn / abandoned Sarpy, NESPP Apr 20202023
Gas project GEN-2020-026, Sarpy County
Gas
56.5 MWWithdrawn / abandoned Sarpy, NESPP Apr 20202023
Gas project GEN-2020-041, Cass County
Gas
56.5 MWWithdrawn / abandoned Cass, NESPP Apr 20202023
Gas project GEN-2020-048, Douglas County
Gas
56.5 MWWithdrawn / abandoned Douglas, NESPP Apr 20202023
Gas project GEN-2020-042, Cass County
Gas
56.5 MWWithdrawn / abandoned Cass, NESPP Apr 20202023
Gas project GEN-2020-037, Cass County
Gas
56.5 MWWithdrawn / abandoned Cass, NESPP Apr 20202023
Gas project GEN-2020-039, Cass County
Gas
56.5 MWWithdrawn / abandoned Cass, NESPP Apr 20202023
Gas project GEN-2020-049, Douglas County
Gas
56.5 MWWithdrawn / abandoned Douglas, NESPP Apr 20202023
Gas project GEN-2020-050, Douglas County
Gas
56.5 MWWithdrawn / abandoned Douglas, NESPP Apr 20202023
Gas project GEN-2020-047, Douglas County
Gas
56.5 MWWithdrawn / abandoned Douglas, NESPP Apr 20202023
Gas project GEN-2020-046, Douglas County
Gas
56.5 MWWithdrawn / abandoned Douglas, NESPP Apr 20202023
Gas project GEN-2020-034, Sarpy County
Gas
56.5 MWWithdrawn / abandoned Sarpy, NESPP Apr 20202023
Gas project GEN-2020-029, Sarpy County
Gas
56.5 MWWithdrawn / abandoned Sarpy, NESPP Apr 20202023
Solar + storage project GEN-2020-033, Sarpy County
Solar + storage
50.0 MWWithdrawn / abandoned Sarpy, NESPP Apr 2020target 2023
Solar + storage project GEN-2020-030, Sarpy County
Solar + storage
50.0 MWWithdrawn / abandoned Sarpy, NESPP Apr 20202024
Solar + storage project GEN-2020-027, Sarpy County
Solar + storage
50.0 MWWithdrawn / abandoned Sarpy, NESPP Apr 20202024

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)