United States βΊ Grid βΊ Interconnection queues βΊ Montana
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in Montana (2018 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar project 342, Beaverhead County Solar |
240 MW | Withdrawn / abandoned |
| Gas project 352, Sweet Grass County Gas |
150 MW | Withdrawn / abandoned |
| Gas project 338, Sweet Grass County Gas |
128 MW | Withdrawn / abandoned |
| Solar + storage project 1090, Big Horn County Solar + storage |
80.0 MW | Withdrawn / abandoned |
| Solar project 75, Sanders County Solar |
80.0 MW | Withdrawn / abandoned |
| Solar + storage project 1091, Big Horn County Solar + storage |
80.0 MW | Withdrawn / abandoned |
| Onshore wind project 353, Wheatland County Onshore wind |
80.0 MW | Withdrawn / abandoned |
| Solar + storage project 1089, Big Horn County Solar + storage |
80.0 MW | Withdrawn / abandoned |
| Onshore wind project 351, Wheatland County Onshore wind |
75.0 MW | Withdrawn / abandoned |
| Solar project 346, Golden Valley County Solar |
74.9 MW | Withdrawn / abandoned |
| Solar project 345, Yellowstone County Solar |
25.9 MW | Withdrawn / abandoned |
| Onshore wind project 355, Teton County Onshore wind |
20.0 MW | Withdrawn / abandoned |
| Onshore wind project 344, Teton County Onshore wind |
20.0 MW | Withdrawn / abandoned |
| Onshore wind project 323, Meagher County Onshore wind |
9.0 MW | Withdrawn / abandoned |
| Solar project 354, Madison County Solar |
3.0 MW | Withdrawn / abandoned |
| Solar project 359, Madison County Solar |
2.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)