Solar project 359, Madison County

Solar project 359, Madison County is a 2.0 MW solar request withdrawn in the West interconnection queue, in Madison County, Montana, connecting to NorthWestern Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2018 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
359
Grid region
West (non-ISO utilities)
Utility / transmission owner
NorthWestern Energy
Connection point (POI)
Third 12.47kV pole emanating west from Pony Harrison Substation
Location
Madison County, Montana
Technology
Solar: 2.0 MW
Total requested
2.0 MW
Service type
Energy only (ERIS)
Study phase
Feasibility Study System Impact Study
Queue status
Withdrawn
Entered queue
23 October 2018
Proposed online date
June 2020

Location

Marker shows the centre of Madison County; the queue data does not give exact sites.

Power plants in Montana Β· Transmission lines in Montana

Other requests in Madison County