Solar project 307, Madison County

Solar project 307, Madison County is a 3.0 MW solar request withdrawn in the West interconnection queue, in Madison County, Montana, connecting to NorthWestern Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2016 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
307
Grid region
West (non-ISO utilities)
Utility / transmission owner
NorthWestern Energy
Connection point (POI)
12.5kV at Twin Bridges Substation
Location
Madison County, Montana
Technology
Solar: 3.0 MW
Total requested
3.0 MW
Service type
Energy only (ERIS)
Study phase
Feasibility Study System Impact Study Facilities Study
Queue status
Withdrawn
Entered queue
10 November 2016
Proposed online date
October 2020

Location

Marker shows the centre of Madison County; the queue data does not give exact sites.

Power plants in Montana Β· Transmission lines in Montana

Other requests in Madison County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem