United States β€Ί Grid β€Ί Interconnection queues β€Ί Montana

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Montana (2013 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown7780 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn7780 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

7 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Onshore wind project 164, Rosebud County
Onshore wind
301 MWWithdrawn / abandoned Rosebud, MTWest Sep 2013target 2021
Onshore wind project 163, Rosebud County
Onshore wind
301 MWWithdrawn / abandoned Rosebud, MTWest Jul 2013target 2016
Onshore wind project GI-1302, Roosevelt County
Onshore wind
120 MWWithdrawn / abandoned Roosevelt, MTWest Mar 2013target 2016
Onshore wind project GI-1307, Valley County
Onshore wind
23.0 MWWithdrawn / abandoned Valley, MTWest Jun 2013target 2013
Onshore wind project GI-1303, Valley County
Onshore wind
20.0 MWWithdrawn / abandoned Valley, MTWest Mar 2013target 2013
Hydro project 167, Broadwater County
Hydro
9.8 MWWithdrawn / abandoned Broadwater, MTWest Nov 2013target 2016
Onshore wind project 168, Sweet Grass County
Onshore wind
5.0 MWWithdrawn / abandoned Sweet Grass, MTWest Dec 2013target 2014

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)