ONSHORE WIND Β· WESTOnshore wind project GI-1302, Roosevelt County
Onshore wind project GI-1302, Roosevelt County is a 120 MW onshore wind request withdrawn in the West interconnection queue, in Roosevelt County, Montana, connecting to WAPA/BEPC/HCPD Integrated System.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2013 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GI-1302
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- WAPA/BEPC/HCPD Integrated System
- Connection point (POI)
- Culbertson GS 115kV
- Location
- Roosevelt County, Montana
- Technology
- Wind: 120 MW
- Total requested
- 120 MW
- Service type
- Energy only (ERIS)
- Study phase
- IAP
- Queue status
- Withdrawn
- Entered queue
- 21 March 2013
- Proposed online date
- October 2016
Location
Marker shows the centre of Roosevelt County; the queue data does not give exact sites.