πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Montana

ONSHORE WIND Β· WEST

Onshore wind project 164, Rosebud County

Onshore wind project 164, Rosebud County is a 301 MW onshore wind request withdrawn in the West interconnection queue, in Rosebud County, Montana, connecting to NorthWestern Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2013 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
164
Grid region
West (non-ISO utilities)
Utility / transmission owner
NorthWestern Energy
Connection point (POI)
230kV at Colstrip Substation
Location
Rosebud County, Montana
Technology
Wind: 301 MW
Total requested
301 MW
Service type
Energy only (ERIS)
Study phase
Feasibility Study System Impact Study System Impact Study-Revised
Queue status
Withdrawn
Entered queue
30 September 2013
Proposed online date
October 2021

Location

Marker shows the centre of Rosebud County; the queue data does not give exact sites.

Power plants in Montana Β· Transmission lines in Montana

Other requests in Rosebud County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem