United States β€Ί Grid β€Ί Interconnection queues β€Ί Montana

COAL Β· WEST

Coal project 20, Rosebud County

Coal project 20, Rosebud County is a 500 MW coal request withdrawn in the West interconnection queue, in Rosebud County, Montana, connecting to NorthWestern Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2002 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
20
Grid region
West (non-ISO utilities)
Utility / transmission owner
NorthWestern Energy
Connection point (POI)
Colstrip Switchyard
Location
Rosebud County, Montana
Technology
Coal: 500 MW
Total requested
500 MW
Service type
Energy only (ERIS)
Study phase
Feasibility Study System Impact Study
Queue status
Withdrawn
Entered queue
15 March 2002
Proposed online date
April 2013

Location

Marker shows the centre of Rosebud County; the queue data does not give exact sites.

Power plants in Montana Β· Transmission lines in Montana

Other requests in Rosebud County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem