United States βΊ Grid βΊ Interconnection queues βΊ Montana
ONSHORE WIND Β· WESTOnshore wind project GI-1303, Valley County
Onshore wind project GI-1303, Valley County is a 20.0 MW onshore wind request withdrawn in the West interconnection queue, in Valley County, Montana, connecting to WAPA/BEPC/HCPD Integrated System.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2013 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GI-1303
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- WAPA/BEPC/HCPD Integrated System
- Connection point (POI)
- Richardson Coulee 161kV
- Location
- Valley County, Montana
- Technology
- Wind: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- IAP
- Queue status
- Withdrawn
- Entered queue
- 21 March 2013
- Proposed online date
- December 2013
Location
Marker shows the centre of Valley County; the queue data does not give exact sites.
Other requests in Valley County
- Onshore wind project GI-0406, Valley CountyOnshore wind Β· 250 MW Β· withdrawn
- Onshore wind project GI-0203, Valley CountyOnshore wind Β· 50.0 MW Β· withdrawn
- Onshore wind project GI-1307, Valley CountyOnshore wind Β· 23.0 MW Β· withdrawn
- Onshore wind project 155, Valley CountyOnshore wind Β· 20.0 MW Β· withdrawn
- Onshore wind project GI-1213, Valley CountyOnshore wind Β· 20.0 MW Β· withdrawn
- Gas project GI-0102a, Valley CountyGas Β· 14.0 MW Β· withdrawn
- Solar project 442, Valley CountySolar Β· 3.0 MW Β· withdrawn
- Onshore wind project GI-0811, Valley CountyOnshore wind Β· 3.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem