United States β€Ί Grid β€Ί Interconnection queues β€Ί Missouri

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Missouri (2016 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown111,441 MW
Active in queue238 MW1 requests
Agreement signed238 MW1 requests
Withdrawn111,441 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

11 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Onshore wind project J682, Schuyler County
Onshore wind
400 MWWithdrawn / abandoned Schuyler, MOMISO Jul 2016target 2019
Onshore wind project J598, Adair County
Onshore wind
300 MWWithdrawn / abandoned Adair, MOMISO May 2016target 2021
Onshore wind project GEN-2016-088, Dekalb County
Onshore wind
151 MWWithdrawn / abandoned Dekalb, MOSPP Aug 20162021
Onshore wind project J570, Atchison County
Onshore wind
150 MWWithdrawn / abandoned Atchison, MOMISO May 2016target 2018
Onshore wind project J658, Audrain County
Onshore wind
100 MWWithdrawn / abandoned Audrain, MOMISO Jul 2016target 2018
Solar project J782, Stoddard County
Solar
100 MWWithdrawn / abandoned Stoddard, MOMISO Nov 2016target 2021
Onshore wind project GI-54, Nodaway County
Onshore wind
84.0 MWWithdrawn / abandoned Nodaway, MOSoutheast May 2016target 2018
Onshore wind project GI-56, Sullivan County
Onshore wind
77.5 MWWithdrawn / abandoned Sullivan, MOSoutheast May 2016target 2018
Solar project J573, Washington County
Solar
40.0 MWWithdrawn / abandoned Washington, MOMISO May 2016target 2018
Solar project GEN-2016-168, Lafayette County
Solar
20.0 MWWithdrawn / abandoned Lafayette, MOSPP Nov 2016target 2019
Onshore wind project GEN-2016-040, Dekalb County
Onshore wind
18.4 MWWithdrawn / abandoned Dekalb, MOSPP Mar 20162016

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)