United States β€Ί Grid β€Ί Interconnection queues β€Ί Mississippi

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Mississippi (2025 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown6938 MW
Active in queue3,970 MW17 requests
Agreement signed0.0 MW0 requests
Withdrawn6938 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

6 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Onshore wind project J4064, Tallahatchie County
Onshore wind
200 MWWithdrawn / abandoned Tallahatchie, MSMISO Sep 2025target 2030
Solar project J3826, Holmes County
Solar
198 MWWithdrawn / abandoned Holmes, MSMISO Oct 2025target 2026
Battery storage project J4067, Panola County
Battery storage
180 MWWithdrawn / abandoned Panola, MSMISO Sep 2025target 2029
Battery storage project J4107, Covington County
Battery storage
150 MWWithdrawn / abandoned Covington, MSMISO Oct 2025target 2030
Solar + storage project 25-IC-1359, Pearl River County
Solar + storage
130 MWWithdrawn / abandoned Pearl River, MSSoutheast Apr 2025
Solar + storage project 25-IC-1335, Perry County
Solar + storage
80.0 MWWithdrawn / abandoned Perry, MSSoutheast Apr 2025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)