United States βΊ Grid βΊ Interconnection queues βΊ Mississippi
BATTERY STORAGE Β· MISOBattery storage project J4107, Covington County
Battery storage project J4107, Covington County is a 150 MW battery storage request withdrawn in the MISO interconnection queue, in Covington County, Mississippi, connecting to COOPERATIVE ENERGY.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2025 (completed)
- Withdrawn / abandonedDec 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J4107
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- COOPERATIVE ENERGY
- Connection point (POI)
- Southwest Lone Star 161 - Mississippi Hub 161.0kV
- Location
- Covington County, Mississippi
- Technology
- Battery: 150 MW
- Total requested
- 150 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 7 October 2025
- Proposed online date
- October 2030
- Withdrawn
- December 2025
Location
Marker shows the centre of Covington County; the queue data does not give exact sites.