BATTERY STORAGE Β· MISO

Battery storage project J4107, Covington County

Battery storage project J4107, Covington County is a 150 MW battery storage request withdrawn in the MISO interconnection queue, in Covington County, Mississippi, connecting to COOPERATIVE ENERGY.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2025 (completed)
  2. Withdrawn / abandonedDec 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J4107
Grid region
MISO (Midcontinent)
Utility / transmission owner
COOPERATIVE ENERGY
Connection point (POI)
Southwest Lone Star 161 - Mississippi Hub 161.0kV
Location
Covington County, Mississippi
Technology
Battery: 150 MW
Total requested
150 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
7 October 2025
Proposed online date
October 2030
Withdrawn
December 2025

Location

Marker shows the centre of Covington County; the queue data does not give exact sites.

Power plants in Mississippi Β· Transmission lines in Mississippi

Other requests in Covington County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem