United States βΊ Grid βΊ Interconnection queues βΊ Mississippi
SOLAR Β· MISOSolar project J2971, Covington County
Solar project J2971, Covington County is a 280 MW solar request withdrawn in the MISO interconnection queue, in Covington County, Mississippi, connecting to COOPERATIVE ENERGY.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedMar 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2971
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- COOPERATIVE ENERGY
- Connection point (POI)
- Southwest Lone Star 161 kV - Mississippi Hub 161 kV
- Location
- Covington County, Mississippi
- Technology
- Solar: 280 MW
- Total requested
- 280 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 15 September 2022
- Proposed online date
- August 2026
- Withdrawn
- March 2023
Location
Marker shows the centre of Covington County; the queue data does not give exact sites.
Power plants in Mississippi Β· Transmission lines in Mississippi
Other requests in Covington County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem