Solar project J2971, Covington County

Solar project J2971, Covington County is a 280 MW solar request withdrawn in the MISO interconnection queue, in Covington County, Mississippi, connecting to COOPERATIVE ENERGY.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2022 (completed)
  2. Withdrawn / abandonedMar 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J2971
Grid region
MISO (Midcontinent)
Utility / transmission owner
COOPERATIVE ENERGY
Connection point (POI)
Southwest Lone Star 161 kV - Mississippi Hub 161 kV
Location
Covington County, Mississippi
Technology
Solar: 280 MW
Total requested
280 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 2; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
15 September 2022
Proposed online date
August 2026
Withdrawn
March 2023

Location

Marker shows the centre of Covington County; the queue data does not give exact sites.