United States βΊ Grid βΊ Interconnection queues βΊ Mississippi
BATTERY STORAGE Β· MISOBattery storage project J4067, Panola County
Battery storage project J4067, Panola County is a 180 MW battery storage request withdrawn in the MISO interconnection queue, in Panola County, Mississippi, connecting to ENTERGY MISSISSIPPI, LLC..
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2025 (completed)
- Withdrawn / abandonedJan 2026 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J4067
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY MISSISSIPPI, LLC.
- Connection point (POI)
- Batesville
- Location
- Panola County, Mississippi
- Technology
- Battery: 180 MW
- Total requested
- 180 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 25 September 2025
- Proposed online date
- February 2029
- Withdrawn
- January 2026
Location
Marker shows the centre of Panola County; the queue data does not give exact sites.
Power plants in Mississippi Β· Transmission lines in Mississippi
Other requests in Panola County
- Solar + storage project J2957, Panola CountySolar + storage Β· 100 MW Β· in study
- Other project 1, Panola CountyOther Β· 860 MW Β· built
- Other project 1Other Β· 860 MW Β· built
- Solar + storage project 520, Panola CountySolar + storage Β· 400 MW Β· withdrawn
- Other project 194, Panola CountyOther Β· 329 MW Β· withdrawn
- Other project 167, Panola CountyOther Β· 329 MW Β· withdrawn
- Other project 28, Panola CountyOther Β· 300 MW Β· withdrawn
- Solar project 293, Panola CountySolar Β· 200 MW Β· withdrawn
- Solar project J3450, Panola CountySolar Β· 200 MW Β· withdrawn
- Solar project J670, Panola CountySolar Β· 200 MW Β· withdrawn
- Solar project 344, Panola CountySolar Β· 150 MW Β· withdrawn
- Solar project J2721, Panola CountySolar Β· 120 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem