United States β€Ί Grid β€Ί Interconnection queues β€Ί Mississippi

SOLAR Β· SOUTHEAST

Solar project 344, Panola County

Solar project 344, Panola County is a 150 MW solar request withdrawn in the Southeast interconnection queue, in Panola County, Mississippi, connecting to Tennessee Valley Authority.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2018 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
344
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Tennessee Valley Authority
Location
Panola County, Mississippi
Technology
Solar: 150 MW
Total requested
150 MW
Queue status
Withdrawn
Entered queue
19 April 2018

Location

Marker shows the centre of Panola County; the queue data does not give exact sites.

Power plants in Mississippi Β· Transmission lines in Mississippi

Other requests in Panola County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem