Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Replacing 710 MW of coal generation with solar at Sherco Unit 2; Sherco Unit 2 Other |
710 MW | In study |
| Replacing 135.5 MW with 135.5 MW BESS; Blue Lake Units 1 2 4 Other |
136 MW | In study |
| replacing 100MW of un-built solar with BESS; Mayhew Other |
100 MW | In study |
| Surplus; J385 Other |
100 MW | In study |
| Replace Hoot Lake units 2 and 3 (144.8 MW) with Seventeen (17) Sungrow 3 MW solar inverters and PV panels at 49.9 MW; Hoot Lake 2 & 3 Other |
49.9 MW | In study |
| Other project J2276, Douglas County Other |
39.5 MW | In study |
| Other project J2116, Cook County Other |
18.0 MW | In study |
| Other project G177, Lyon County Other |
5.0 MW | Agreement signed |
| Other project J258, Stearns County Other |
1.0 MW | Agreement signed |
| Other project L009, Jackson County Other |
-11.0 MW | In study |
| Other project L002, Scott County Other |
-28.0 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)