United States › Grid › Interconnection queues › Minnesota
OTHER · MISOOther project J2276, Douglas County
Other project J2276, Douglas County is a 39.5 MW other request in interconnection study in the MISO interconnection queue, in Douglas County, Minnesota, connecting to MISSOURI RIVER ENERGY SERVICES - TRANSMISSION.
- PlanningQueued Apr 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jan 2022 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- J2276
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- MISSOURI RIVER ENERGY SERVICES - TRANSMISSION
- Connection point (POI)
- ALEXANDRIA
- Location
- Douglas County, Minnesota
- Technology
- Solar: 39.5 MW · Wind
- Total requested
- 39.5 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 3; Post GIA Status: Not Started
- Queue status
- Active
- Entered queue
- 11 April 2022
- Proposed online date
- January 2022
Location
Marker shows the centre of Douglas County; the queue data does not give exact sites.
Other requests in Douglas County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem