United States βΊ Grid βΊ Interconnection queues βΊ Minnesota
ONSHORE WIND Β· MISOOnshore wind project J019, Douglas County
Onshore wind project J019, Douglas County is a 100 MW onshore wind request withdrawn in the MISO interconnection queue, in Douglas County, Minnesota.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2009 (completed)
- Withdrawn / abandonedJun 2009 (project stopped here)
- ConsentedJun 2009 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J019
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- OTP 115 kV Douglas Co. substation
- Location
- Douglas County, Minnesota
- Technology
- Wind: 100 MW
- Total requested
- 100 MW
- Study phase
- Feasibility
- Queue status
- Withdrawn
- Entered queue
- 6 January 2009
- Agreement signed
- 23 June 2009
- Proposed online date
- December 2012
- Withdrawn
- June 2009
Location
Marker shows the centre of Douglas County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Other requests in Douglas County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem