SOLAR Β· MISOSolar project J1108, Douglas County
Solar project J1108, Douglas County is a 150 MW solar request withdrawn in the MISO interconnection queue, in Douglas County, Minnesota, connecting to MISSOURI RIVER ENERGY SERVICES.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2018 (completed)
- Withdrawn / abandonedMar 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1108
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- MISSOURI RIVER ENERGY SERVICES
- Connection point (POI)
- Alexandria 345 kV Substation
- Location
- Douglas County, Minnesota
- Technology
- Solar: 150 MW
- Total requested
- 150 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 12 March 2018
- Proposed online date
- June 2021
- Withdrawn
- March 2020
Location
Marker shows the centre of Douglas County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Other requests in Douglas County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem