United States › Grid › Interconnection queues › Minnesota
OTHER · MISOOther project L002, Scott County
Other project L002, Scott County is a -28.0 MW other request in interconnection study in the MISO interconnection queue, in Scott County, Minnesota.
Queue statusIn planning
- PlanningQueued May 2004 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Oct 2015 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- L002
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Unknown
- Location
- Scott County, Minnesota
- Technology
- Other: -28.0 MW
- Total requested
- -28.0 MW
- Study phase
- In Progress (unknown study)
- Queue status
- Active
- Entered queue
- 11 May 2004
- Proposed online date
- October 2015
Location
Marker shows the centre of Scott County; the queue data does not give exact sites.
Other requests in Scott County
- Replacing 135.5 MW with 135.5 MW BESS; Blue Lake Units 1 2 4Other · 136 MW · in study
- Replacing 55 MW with 29 MW Natural Gas/Fuel Oil; Blue Lake Unit 3Gas · 55.0 MW · in study
- Gas project G369, Scott CountyGas · 385 MW · built
- Other project G417, Scott CountyOther · 15.0 MW · built
- Onshore wind project G895, Scott CountyOnshore wind · 1,500 MW · withdrawn
- Onshore wind project G896, Scott CountyOnshore wind · 1,500 MW · withdrawn
- Gas project G266, Scott CountyGas · 1,005 MW · withdrawn
- Battery storage project J2200, Scott CountyBattery storage · 200 MW · withdrawn
- Battery storage project J3369, Scott CountyBattery storage · 200 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem