United States βΊ Grid βΊ Interconnection queues βΊ Minnesota
ONSHORE WIND Β· MISOOnshore wind project G895, Scott County
Onshore wind project G895, Scott County is a 1,500 MW onshore wind request withdrawn in the MISO interconnection queue, in Scott County, Minnesota.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2007 (completed)
- Withdrawn / abandonedDec 2008 (project stopped here)
- ConsentedDec 2008 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G895
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Scott Junction 345/115 kV substation
- Location
- Scott County, Minnesota
- Technology
- Wind: 1,500 MW
- Total requested
- 1,500 MW
- Study phase
- Feasibility
- Queue status
- Withdrawn
- Entered queue
- 23 October 2007
- Agreement signed
- 1 December 2008
- Proposed online date
- September 2010
- Withdrawn
- December 2008
Location
Marker shows the centre of Scott County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Other requests in Scott County
- Replacing 135.5 MW with 135.5 MW BESS; Blue Lake Units 1 2 4Other Β· 136 MW Β· in study
- Replacing 55 MW with 29 MW Natural Gas/Fuel Oil; Blue Lake Unit 3Gas Β· 55.0 MW Β· in study
- Other project L002, Scott CountyOther Β· -28.0 MW Β· in study
- Gas project G369, Scott CountyGas Β· 385 MW Β· built
- Other project G417, Scott CountyOther Β· 15.0 MW Β· built
- Onshore wind project G896, Scott CountyOnshore wind Β· 1,500 MW Β· withdrawn
- Gas project G266, Scott CountyGas Β· 1,005 MW Β· withdrawn
- Battery storage project J2200, Scott CountyBattery storage Β· 200 MW Β· withdrawn
- Battery storage project J3369, Scott CountyBattery storage Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem