United States βΊ Grid βΊ Interconnection queues βΊ Michigan
OCTARY USA Β· INTERCONNECTION QUEUESInterconnection queue in Michigan (2023 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Replacing 749 MW of coal generation with BESS; Campbell 3 Other |
749 MW | In study |
| Replacing 220 MW of coal generation with BESS; Trenton Channel 9 Other |
220 MW | In study |
| Solar project J1914, Presque Isle County Solar |
150 MW | In study |
| Solar project J1939, Saginaw County Solar |
125 MW | In study |
| Solar project J1916, Branch County Solar |
100 MW | In study |
| Battery storage project J2555, Ingham County Battery storage |
100 MW | In study |
| Solar project AI2-358, Van Buren County Solar |
70.0 MW | In study |
| Solar project AI2-144, St. Joseph County Solar |
36.0 MW | In study |
| Solar project AI2-169, Cass County Solar |
24.0 MW | In study |
| Solar project AI2-340, Van Buren County Solar |
23.1 MW | In study |
| Solar project AI2-215, Cass County Solar |
18.1 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)