Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Onshore wind project J194, Manistee County Onshore wind |
300 MW | Withdrawn / abandoned |
| Onshore wind project J195, Shiawassee County Onshore wind |
200 MW | Withdrawn / abandoned |
| Onshore wind project J222, Gratiot County Onshore wind |
200 MW | Withdrawn / abandoned |
| Onshore wind project J204, Calhoun County Onshore wind |
200 MW | Withdrawn / abandoned |
| Onshore wind project J197, Lenawee County Onshore wind |
125 MW | Withdrawn / abandoned |
| Onshore wind project J199, Gratiot County Onshore wind |
120 MW | Withdrawn / abandoned |
| Onshore wind project J225, Eaton County Onshore wind |
100 MW | Withdrawn / abandoned |
| Solar project J207, Washtenaw County Solar |
100 MW | Withdrawn / abandoned |
| Onshore wind project J070, Clinton County Onshore wind |
49.2 MW | Withdrawn / abandoned |
| Gas project J219, Washtenaw County Gas |
46.0 MW | Withdrawn / abandoned |
| Solar project J220, Monroe County Solar |
45.0 MW | Withdrawn / abandoned |
| Other project J234, Midland County Other |
35.0 MW | Withdrawn / abandoned |
| Solar project J206, Wayne County Solar |
25.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)