United States βΊ Grid βΊ Interconnection queues βΊ Michigan
GAS Β· MISOGas project J219, Washtenaw County
Gas project J219, Washtenaw County is a 46.0 MW gas request withdrawn in the MISO interconnection queue, in Washtenaw County, Michigan.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2011 (completed)
- Withdrawn / abandonedJan 2013 (project stopped here)
- ConsentedJan 2013 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J219
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Dayton - Judd 120kV
- Location
- Washtenaw County, Michigan
- Technology
- Gas: 46.0 MW
- Total requested
- 46.0 MW
- Study phase
- Feasibility
- Queue status
- Withdrawn
- Entered queue
- 27 June 2011
- Agreement signed
- 22 January 2013
- Proposed online date
- August 2012
- Withdrawn
- January 2013
Location
Marker shows the centre of Washtenaw County; the queue data does not give exact sites.
Other requests in Washtenaw County
- Solar project J799, Washtenaw CountySolar Β· 189 MW Β· under construction
- Solar project J1224, Washtenaw CountySolar Β· 170 MW Β· under construction
- Battery storage project J1659, Washtenaw CountyBattery storage Β· 100 MW Β· under construction
- Battery storage project J1329, Washtenaw CountyBattery storage Β· 20.0 MW Β· under construction
- Solar project J1062, Washtenaw CountySolar Β· 200 MW Β· agreement signed
- Gas project J3923, Washtenaw CountyGas Β· 1,414 MW Β· in study
- Solar project J3945, Washtenaw CountySolar Β· 245 MW Β· in study
- Surplus; J1062Other Β· 150 MW Β· in study
- Battery storage project J3009, Washtenaw CountyBattery storage Β· 150 MW Β· in study
- Battery storage project J3654, Washtenaw CountyBattery storage Β· 150 MW Β· in study
- Battery storage project J1844, Washtenaw CountyBattery storage Β· 100 MW Β· in study
- Surplus; J1224/J1329Other Β· 85.1 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem