Withdrawn queue requests in Massachusetts (2014 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown61,807 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn61,807 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

6 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Combined Cycle
Gas
837 MWWithdrawn / abandoned Hampden, MAISO-NE Dec 2014target 2019
Simple Cycle
Gas
478 MWWithdrawn / abandoned Essex, MAISO-NE Feb 2014target 2018
Combined Cycle
Gas
388 MWWithdrawn / abandoned Hampden, MAISO-NE Feb 2014target 2019
Gas Turbine
Gas
104 MWWithdrawn / abandoned Norfolk, MAISO-NE Mar 2014target 2018
Combined Cycle Increase
Gas
22.0 MWWithdrawn / abandoned Hampden, MAISO-NE Jun 2014target 2019
Potter Repowering
Gas
-21.2 MWWithdrawn / abandoned Norfolk, MAISO-NE Feb 2014target 2019

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)