United States β€Ί Grid β€Ί Interconnection queues β€Ί Maine

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Maine (2018 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown232,816 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn232,816 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

23 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Wind
Onshore wind
601 MWWithdrawn / abandoned Aroostook, MEISO-NE Apr 2018target 2021
Wind
Onshore wind
601 MWWithdrawn / abandoned Aroostook, MEISO-NE Apr 2018target 2021
Wind
Onshore wind
241 MWWithdrawn / abandoned Franklin, MEISO-NE Apr 2018target 2021
Wind
Onshore wind
214 MWWithdrawn / abandoned Franklin, MEISO-NE Apr 2018target 2021
Solar
Solar
150 MWWithdrawn / abandoned Franklin, MEISO-NE Apr 2018target 2021
Wind
Onshore wind
150 MWWithdrawn / abandoned Franklin, MEISO-NE Apr 2018target 2022
Wind
Onshore wind
104 MWWithdrawn / abandoned Aroostook, MEISO-NE Apr 2018target 2022
Wind
Onshore wind
104 MWWithdrawn / abandoned Aroostook, MEISO-NE Apr 2018target 2022
Wind
Onshore wind
104 MWWithdrawn / abandoned Aroostook, MEISO-NE Apr 2018target 2022
Wind
Onshore wind
104 MWWithdrawn / abandoned Aroostook, MEISO-NE Apr 2018target 2022
Wind
Onshore wind
104 MWWithdrawn / abandoned Aroostook, MEISO-NE Apr 2018target 2022
Wind
Onshore wind
89.7 MWWithdrawn / abandoned Somerset, MEISO-NE Apr 2018target 2020
Solar
Solar
50.0 MWWithdrawn / abandoned York, MEISO-NE Dec 2018target 2021
Battery storage addition (see Q745)
Wind + storage
24.4 MWWithdrawn / abandoned Franklin, MEISO-NE Apr 2018target 2021
Battery storage addition (see Q746)
Wind + storage
24.3 MWWithdrawn / abandoned Franklin, MEISO-NE Apr 2018target 2021
Solar
Solar
20.0 MWWithdrawn / abandoned Somerset, MEISO-NE Apr 2018target 2021
Solar
Solar
20.0 MWWithdrawn / abandoned Kennebec, MEISO-NE Aug 2018target 2021
Solar
Solar
20.0 MWWithdrawn / abandoned Kennebec, MEISO-NE Apr 2018target 2021
Solar
Solar
20.0 MWWithdrawn / abandoned Somerset, MEISO-NE Jun 2018target 2020
Keay Brook Energy Solar
Solar
19.9 MWWithdrawn / abandoned York, MEISO-NE Sep 2018target 2025
Solar
Solar
19.8 MWWithdrawn / abandoned Somerset, MEISO-NE Nov 2018target 2022
Battery Storage
Battery storage
19.0 MWWithdrawn / abandoned Penobscot, MEISO-NE Jul 2018target 2019
Solar
Solar
15.0 MWWithdrawn / abandoned Androscoggin, MEISO-NE Nov 2018target 2021

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)