BATTERY STORAGE · ISO-NE

Battery Storage

Battery Storage is a 19.0 MW battery storage request withdrawn in the ISO-NE interconnection queue, in Penobscot County, Maine.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2018 (completed)
  2. Withdrawn / abandonedAug 2018 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
771
Grid region
ISO-NE (New England)
Connection point (POI)
Lincoln (Maine) - 46 kv - bus #103039
Location
Penobscot County, Maine
Technology
Battery: 19.0 MW
Total requested
19.0 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
26 July 2018
Proposed online date
June 2019
Withdrawn
August 2018

Location

Marker shows the centre of Penobscot County; the queue data does not give exact sites.

Power plants in Maine · Transmission lines in Maine

Other requests in Penobscot County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem