United States β€Ί Grid β€Ί Interconnection queues β€Ί Louisiana

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Louisiana (2023 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown4644 MW
Active in queue644 MW4 requests
Agreement signed325 MW1 requests
Withdrawn6570 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project J1598, Calcasieu Parish County
Solar
325 MWAgreement signed Calcasieu Parish, LAMISO Dec 2023target 2026
Solar + storage project GEN-2023-230, Bossier Parish County
Solar + storage
150 MWIn study Bossier Parish, LASPP Oct 2023target 2028
Solar + storage project J2152, Tangipahoa Parish County
Solar + storage
120 MWIn study Tangipahoa Parish, LAMISO Nov 2023target 2025
Replacing 49 MW of gas generation with BESS; Sterlington
Other
49.0 MWIn study Ouachita, LAMISO Oct 2023target 2025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)