Interconnection queue in Kentucky (2021 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown121,298 MW
Active in queue1,298 MW12 requests
Agreement signed360 MW3 requests
Withdrawn7911.6 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

12 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar + storage project LGE-GIS-2021-009, Hardin County
Solar + storage
200 MWPaused / redesign Hardin, KYSoutheast Mar 2021target 2026
Solar + storage project AH2-021, Barren County
Solar + storage
150 MWIn study Barren, KYPJM Oct 2021target 2026
Solar project LGE-GIS-2021-010, Marion County
Solar
120 MWAgreement signed Marion, KYSoutheast Mar 2021target 2026
Solar + storage project LGE-GIS-2021-020, Mccracken County
Solar + storage
120 MWAgreement signed Mccracken, KYSoutheast Jun 2021target 2026
Solar project LGE-GIS-2021-007, Mccracken County
Solar
120 MWPaused / redesign Mccracken, KYSoutheast Mar 2021target 2026
Battery storage project LGE-GIS-2021-013, Hardin County
Battery storage
120 MWAgreement signed Hardin, KYSoutheast Mar 2021target 2028
Solar + storage project LGE-GIS-2021-018, Bath County
Solar + storage
110 MWPaused / redesign Bath, KYSoutheast May 2021target 2027
Solar + storage project LGE-GIS-2021-017, Mason County
Solar + storage
100 MWPaused / redesign Mason, KYSoutheast Apr 2021target 2026
Solar project LGE-GIS-2021-019, Boyle County
Solar
100 MWPaused / redesign Boyle, KYSoutheast May 2021target 2027
Solar project AH2-002, Barren County
Solar
80.0 MWIn study Barren, KYPJM Oct 2021target 2024
Solar project J1649, Mccracken County
Solar
60.0 MWIn study Mccracken, KYMISO Mar 2021target 2025
Hydro project 476, Lyon County
Hydro
18.0 MWIn study Lyon, KYSoutheast Apr 2021target 2027

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)