United States βΊ Grid βΊ Interconnection queues βΊ Florida
OCTARY USA Β· INTERCONNECTION QUEUESQueue projects under construction in Florida
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Gas project 137, Pasco County Gas Β· Seminole Electric Cooperative, Inc. |
575 MW | Under construction |
| Battery storage project 292, Pinellas County Battery storage Β· Duke Energy Florida, LLC |
225 MW | Under construction |
| Gas project 328, Pinellas County Gas Β· Duke Energy Florida, LLC |
172 MW | Under construction |
| Battery storage project 327, Citrus County Battery storage Β· Duke Energy Florida, LLC |
100 MW | Under construction |
| Gas project 333, Polk County Gas Β· Duke Energy Florida, LLC |
84.0 MW | Under construction |
| Solar project 344, Madison County Solar Β· Duke Energy Florida, LLC |
74.9 MW | Under construction |
| Solar project 259, Highlands County Solar Β· Placid Solar II, LLC |
74.9 MW | Under construction |
| Solar project 343, Orange County Solar Β· Duke Energy Florida, LLC |
74.9 MW | Under construction |
| Solar project 326, Osceola County Solar Β· Duke Energy Florida, LLC |
74.9 MW | Under construction |
| Solar project 342, Orange County Solar Β· Duke Energy Florida, LLC |
74.9 MW | Under construction |
| Solar project 258, Highlands County Solar Β· Placid Solar, LLC |
74.9 MW | Under construction |
| Solar project 323, Jackson County Solar Β· Duke Energy Florida, LLC |
74.9 MW | Under construction |
| Solar project 202.1, Levy County Solar Β· FL SB 9, LLC |
74.9 MW | Under construction |
| Solar project 273, Polk County Solar Β· FL Solar 10, LLC |
74.9 MW | Under construction |
| Solar project 322, Sumter County Solar Β· Duke Energy Florida, LLC |
74.9 MW | Under construction |
| Solar project 341, Orange County Solar Β· Duke Energy Florida, LLC |
74.9 MW | Under construction |
| Solar project 325, Osceola County Solar Β· Duke Energy Florida, LLC |
74.9 MW | Under construction |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)