United States β€Ί Grid β€Ί Interconnection queues β€Ί Connecticut

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Connecticut (2017 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown6471 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn6471 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

6 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas Turbine Repowering
Gas
378 MWWithdrawn / abandoned Middlesex, CTISO-NE Apr 2017target 2021
Solar
Solar
26.0 MWWithdrawn / abandoned Hartford, CTISO-NE Jul 2017target 2019
Gas turbine repowering
Gas
23.0 MWWithdrawn / abandoned Middlesex, CTISO-NE Apr 2017target 2022
Solar
Solar
22.0 MWWithdrawn / abandoned New London, CTISO-NE Jul 2017target 2019
Solar
Solar
20.0 MWWithdrawn / abandoned New Haven, CTISO-NE Mar 2017target 2018
Project Increase
Other
2.2 MWWithdrawn / abandoned Hartford, CTISO-NE Apr 2017target 2017

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)