πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Alabama

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Alabama (2021 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown9698 MW
Active in queue698 MW9 requests
Agreement signed0.0 MW0 requests
Withdrawn211,914 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

9 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar + storage project IC-999, Baldwin County
Solar + storage
80.0 MWPaused / redesign Baldwin, ALSoutheast Dec 2021target 2026
Solar + storage project IC-971, Lowndes County
Solar + storage
80.0 MWPaused / redesign Lowndes, ALSoutheast Jul 2021target 2026
Solar + storage project IC-954, Conecuh County
Solar + storage
80.0 MWPaused / redesign Conecuh, ALSoutheast Apr 2021target 2026
Solar + storage project IC-997, Baldwin County
Solar + storage
80.0 MWPaused / redesign Baldwin, ALSoutheast Dec 2021target 2026
Solar + storage project IC-1000, Baldwin County
Solar + storage
80.0 MWPaused / redesign Baldwin, ALSoutheast Dec 2021target 2026
Solar + storage project IC-979, Conecuh County
Solar + storage
80.0 MWPaused / redesign Conecuh, ALSoutheast Aug 2021target 2026
Solar project IC-943, Talladega County
Solar
80.0 MWPaused / redesign Talladega, ALSoutheast Mar 2021target 2025
Solar project IC-975, Dale County
Solar
80.0 MWPaused / redesign Dale, ALSoutheast Jul 2021target 2025
Solar + storage project IC-955, Lowndes County
Solar + storage
58.0 MWPaused / redesign Lowndes, ALSoutheast Apr 2021target 2026

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)