Battery storage interconnection queue in Alabama

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown61,549 MW
Active in queue1,549 MW6 requests
Agreement signed350 MW2 requests
Withdrawn4488 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

6 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Battery storage project IC-1102, Montgomery County
Battery storage
400 MWPaused / redesign Montgomery, ALSoutheast Dec 2022target 2026
Battery storage project IC-1091, Mobile County
Battery storage
300 MWPaused / redesign Mobile, ALSoutheast Nov 2022target 2027
Battery storage project 25RSC-008, Jackson County
Battery storage
300 MWIn study Jackson, ALSoutheast Jul 2025target 2030
Battery storage project 514, Dekalb County
Battery storage
200 MWAgreement signed Dekalb, ALSoutheast Aug 2022target 2028
Battery storage project 25-IC-1358, Montgomery County
Battery storage
199 MWIn study Montgomery, ALSoutheast Apr 2025target 2029
Battery storage project IC-1210, Walker County
Battery storage
150 MWAgreement signed Walker, ALSoutheast Dec 2023target 2026

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)