United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Texas, West

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown62,021 MW
Active in queue1,947 MW12 requests
Agreement signed950 MW7 requests
Withdrawn62,021 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

6 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Pi1000G
Gas
1,034 MWWithdrawn / abandoned El Paso, TXWest Jun 2025target 2028
EPE Gen - Caliente
Gas
348 MWWithdrawn / abandoned El Paso, TXWest Feb 2011target 2015
EPE Gen - Megellan
Gas
348 MWWithdrawn / abandoned El Paso, TXWest Jan 2011target 2015
N200S PV Project
Solar
170 MWWithdrawn / abandoned El Paso, TXWest Mar 2017target 2020
Granite Mountain Wind Power (Duke Energy Generation Services)
Onshore wind
101 MWWithdrawn / abandoned Hudspeth, TXWest Aug 2010target 2012
Fort Bliss
Solar
20.0 MWWithdrawn / abandoned El Paso, TXWest target 2016

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)