Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Pi1000G Gas |
1,034 MW | Withdrawn / abandoned |
| EPE Gen - Caliente Gas |
348 MW | Withdrawn / abandoned |
| EPE Gen - Megellan Gas |
348 MW | Withdrawn / abandoned |
| N200S PV Project Solar |
170 MW | Withdrawn / abandoned |
| Granite Mountain Wind Power (Duke Energy Generation Services) Onshore wind |
101 MW | Withdrawn / abandoned |
| Fort Bliss Solar |
20.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)530 Β· 95.5 GW
- SPP (Southwest Power Pool)311 Β· 70.8 GW
- MISO (Midcontinent)70 Β· 15.9 GW
- West (non-ISO utilities)6 Β· 2,021 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)